Pelaksana Lapangan Pekerjaan Jalan (Level 6) - SI032023 (SI032023)
Jenis Skema : NULL
Jenjang (Level) : 6
Road Works Field Implementer (Code : SI032023)
Unit Kompetensi:
Kode Unit : F.42PLJ00.001.5
Menerapkan Keselamatan, Kesehatan Kerja dan Lingkungan (K3L)
Implementing Occupational Safety, Health and Environment (K3L)
Kode Unit : F.42PLJ00.002.5
Menerapkan Komunikasi dan Kerja Sama di Tempat Kerja
Implementing Communication and Cooperation in the Workplace
Kode Unit : H.49PPJ00.002.1
Melaksanakan Pekerjaan Persiapan
Carrying out Preparatory Work
Kode Unit : F.42PLJ00.003.5
Melaksanakan Pekerjaan Drainase
Carrying out Drainage Work
Kode Unit : F.42PLJ00.004.5
Melaksanakan Pekerjaan Tanah
Carrying out Earthworks
Kode Unit : F.42PLJ00.005.5
Melaksanakan Pekerjaan Perkerasan Berbutir
Carrying out Granular Pavement Works
Kode Unit : F.42PLJ00.006.5
Melaksanakan Pekerjaan Perkerasan Aspal
Carrying out Asphalt Paving Works
Kode Unit : F.42PLJ00.007.5
Melaksanakan Pekerjaan Perkerasan Beton Semen
Carrying out Cement Concrete Paving Work
Kode Unit : H.49PPJ00.005.1
Mengendalikan Pelaksanaan Pekerjaan Pemasangan Perlengkapan Jalan
Controlling the Implementation of Road Equipment Installation Work
Kode Unit : H.49PPJ00.010.1
Mengendalikan Pengaturan Lalu Lintas di Lokasi Sekitar Pekerjaan
Controlling Traffic Arrangements in the Work Area
Kode Unit : H.49PPJ00.014.1
Memeriksa, Mengevaluasi dan Melaporkan Hasil Pekerjaan Pemasangan Perlengkapan Jalan
Checking, Evaluating and Reporting the Results of Road Equipment Installation Work
Kode Unit : H.49PPJ00.029.1
Melaksanakan Pekerjaan Pemasangan Alat Pemberi Isyarat Lalu Lintas (APILL)
Carrying out Traffic Signal Device Installation Work (APILL)
Kode Unit : H.49PPJ00.030.1
Melaksanakan Pekerjaan Pemasangan Alat Penerangan Jalan (APJ)
Carry out work on installing street lighting equipment (APJ)
Kode Unit : H.49PPJ00.031.1
Melaksanakan Pekerjaan Pemasangan Pagar Pengaman/Guardrail
Carrying out the work of installing safety fences/guardrails
Kode Unit : F.42PPJ00.004.2
Melaksanakan Survei Global/Umum Jalan
Conducting Global/General Road Survey
Kode Unit : F.42PPJ00.005.2
Pemeliharaan Jalan Bagian Jalur dan/atau Lajur Lalu Lintas
Road Maintenance for Traffic Lanes and/or Lanes
Kode Unit : F.42PPJ00.006.2
Pemeliharaan Bahu Jalan
Road Shoulder Maintenance
Kode Unit : F.42PPJ00.007.2
Pemeliharaan Drainase Jalan
Road Drainage Maintenance
Kode Unit : F.42PPJ00.008.2
Pemeliharaan Bangunan Pelengkap Jalan
Maintenance of Road Complementary Buildings
Kode Unit : F.42PPJ00.009.2
Pemeliharaan Perlengkapan Jalan
Road Equipment Maintenance
Kode Unit : F.42PPJ00.010.2
Pemeliharaan Landscape Jalan, Rumija dan Ruwasja
Road, Rumija and Ruwasja Landscape Maintenance
Kode Unit : F.42PPJ00.012.2
Penyerahan Pertama Pekerjaan
First Delivery of Work
Kode Unit : F.42PPJ00.013.2
Penyerahan Kedua Pekerjaan
Second Submission of Work